doi: 10.4304/jsw.6.5.798-805
Research on Dynamic Rescheduling Program Base on Improved Contract Net Protocol
2Key Laboratory of Gansu Advanced Control for Industrial ProcessesLanzhou, Gansu, P.R.China
Abstract—Dynamic rescheduling of workshop production management, with the feature of combinatorial computation complexity, is an important and difficult research area, and be of significant importance for the dynamic scheduling problem. An improved Contract Net Protocol (CNP) with the global two-way, Multi-Agent System (MAS) based communication model, which incorporated the local autonomy of working mutually in consultation by negotiation, is presented in this paper. Furthermore, the simulation results in dynamic scheduling accompanying with its perturbation show that the proposed model and the algorithm are effective to the dynamic scheduling problem in manufacturing system.
Index Terms—MAS, Agent, dynamic scheduling, Contract Net Protocol
Cite: Fuqing Zhao, Jizhe Wang, Jianxin Tang, "Research on Dynamic Rescheduling Program Base on Improved Contract Net Protocol," Journal of Software vol. 6, no. 5, pp. 798-805, 2011.
General Information
ISSN: 1796-217X (Online)
Abbreviated Title: J. Softw.
Frequency: Quarterly
APC: 500USD
DOI: 10.17706/JSW
Editor-in-Chief: Prof. Antanas Verikas
Executive Editor: Ms. Cecilia Xie
Abstracting/ Indexing: DBLP, EBSCO,
CNKI, Google Scholar, ProQuest,
INSPEC(IET), ULRICH's Periodicals
Directory, WorldCat, etcE-mail: jsweditorialoffice@gmail.com
-
Jun 12, 2024 News!
Vol 19, No 2 has been published with online version [Click]
-
Jan 04, 2024 News!
JSW will adopt Article-by-Article Work Flow
-
Apr 01, 2024 News!
Vol 14, No 4- Vol 14, No 12 has been indexed by IET-(Inspec) [Click]
-
Apr 01, 2024 News!
Papers published in JSW Vol 18, No 1- Vol 18, No 6 have been indexed by DBLP [Click]
-
Mar 01, 2024 News!
Vol 19, No 1 has been published with online version [Click]