doi: 10.4304/jsw.8.8.2058-2063
Research on Project Scheduling Problem with Resource Constraints
2School of Business Administration, Zhejiang Gongshang University, Hangzhou, P. R. China
3Center for Studies of Modern Business, Zhejiang Gongshang University, Hangzhou, P. R. China
Abstract—Resource-constrained project scheduling problem is the traditional optimization problem considering constraint conditions of resource supply, which makes the problem more difficult to solve in real life. Resourceconstrained project scheduling problem is a typical NP-hard problem, which is quite popular issue in recent years. This article firstly analyzes the literature review of resourceconstrained project scheduling problem. And then, the mathematical model of this problem is established, and the solution via the genetic algorithm is also developed. Finally, the numerical experiment is adopted to verify the effectiveness and efficiency of the proposed model and algorithm.
Index Terms—Resource-constrained, Project Scheduling, Genetic Algorithm, NP-hard Problem.
Cite: Tinggui Chen, Guanglan Zhou, "Research on Project Scheduling Problem with Resource Constraints," Journal of Software vol. 8, no. 8, pp. 2058-2063, 2013.
General Information
ISSN: 1796-217X (Online)
Abbreviated Title: J. Softw.
Frequency: Biannually
APC: 500USD
DOI: 10.17706/JSW
Editor-in-Chief: Prof. Antanas Verikas
Executive Editor: Ms. Cecilia Xie
Abstracting/ Indexing: DBLP, EBSCO,
CNKI, Google Scholar, ProQuest,
INSPEC(IET), ULRICH's Periodicals
Directory, WorldCat, etcE-mail: jsweditorialoffice@gmail.com
-
Mar 07, 2025 News!
Vol 19, No 4 has been published with online version [Click]
-
Mar 07, 2025 News!
JSW had implemented online submission system [Click]
-
Apr 01, 2024 News!
Vol 14, No 4- Vol 14, No 12 has been indexed by IET-(Inspec) [Click]
-
Apr 01, 2024 News!
Papers published in JSW Vol 18, No 1- Vol 18, No 6 have been indexed by DBLP [Click]
-
Oct 22, 2024 News!
Vol 19, No 3 has been published with online version [Click]