Volume 13 Number 3 (Mar. 2018)
Home > Archive > 2018 > Volume 13 Number 3 (Mar. 2018) >
JSW 2018 Vol.13(3): 201-211 ISSN: 1796-217X
doi: 10.17706/jsw.13.3.201-211

A Study on Probabilistic Schedule Estimation and Refinement of the Small and Medium-Sized Software Development Projects

Donghwoon Kwon1, Ilnam Jeong2, Geumchae Yoon3, Bilal Abu Bakr1, Ki Pyung Kim4*

1Department of Computer Science and Information Systems, Texas A&M University-Commerce, Commerce, TX, USA
2Department of Computer Science, George Washington University, Washington D.C, USA
3ASTI Manufacturing Ltd., Farmers Branch, TX, USA
4School of Natural and Built Environments, University of South Australia, Adelaide,SA, Australia

Abstract— This paper proposes a research framework for objective and probabilistic project schedule estimation and refinement targeted at a small and medium-sized project, as well as, verification of the research framework. Graphic User Interface (GUI) and design documents, which are composed of a class diagram, sequence diagram, and normalized database, are created to count the accurate number of Function Point (FP). The counted FP, which is the main input for calculating Adjusted Function Point (AFP), is then used to estimate an accurate project size, recalculate human resource efforts, and yield single point-based project schedule estimation. According to programmer’s subjective judgment, application development is supposed to be completed within 10 business days. Yet, objective 3-point schedule estimation shows that the success rate of completion within 10 business days is infeasible. Additionally, single point estimation shows that at least 1.313 months (approximately 30 business days) is required to complete application development if more than 80% success rate is expected. The effectiveness of the research framework is successfully demonstrated though development of the actual Android OS-based mobile application (EzMaintenance.apk)..

Index Terms—Android application, probabilistic schedule, small to medium projects

[PDF]

Cite: Donghwoon Kwon, Ilnam Jeong, Geumchae Yoon, Bilal Abu Bakr, Ki Pyung Kim, "A Study on Probabilistic Schedule Estimation and Refinement of the Small and Medium-Sized Software Development Projects," Journal of Software vol. 13, no. 3, pp. 201-211, 2018.

General Information

ISSN: 1796-217X (Online)
Frequency:  Quarterly
Editor-in-Chief: Prof. Antanas Verikas
Executive Editor: Ms. Yoyo Y. Zhou
Abstracting/ Indexing: DBLP, EBSCO, CNKIGoogle Scholar, ProQuest, INSPEC(IET), ULRICH's Periodicals Directory, WorldCat, etc
E-mail: jsweditorialoffice@gmail.com
  • Mar 01, 2024 News!

    Vol 19, No 1 has been published with online version    [Click]

  • Jan 04, 2024 News!

    JSW will adopt Article-by-Article Work Flow

  • Apr 01, 2024 News!

    Vol 14, No 4- Vol 14, No 12 has been indexed by IET-(Inspec)     [Click]

  • Apr 01, 2024 News!

    Papers published in JSW Vol 18, No 1- Vol 18, No 6 have been indexed by DBLP   [Click]

  • Nov 02, 2023 News!

    Vol 18, No 4 has been published with online version   [Click]